Factory Road Bridges

  • Project typeRebuild
  • Project value$1.74 million
  • Project scheduleThis projected was completed in May 2025
  • Contractor nameRoad & Bridge Pty Ltd
  • Completion Date31 May 2025
Complete1.jpg

Two bridges on Factory Road, Yarragon, have recently finished being rebuilt to much safer and suitable standards that meet the needs of their community.

Council is grateful for the $1.384M contribution to this project from the Australian Government’s Safer Local Roads and Infrastructure Program. The remaining $0.356M was funded by Council.

The old Contour Drain Bridge and Moe River Bridge on Factory Road, Yarragon were two timber decking and steel girder bridges that were load limited to just 10 tonnes as they were rapidly approaching end of life. They no longer complied with modern bridge design standards and have been replaced by two new concrete bridges with a much more robust SM1600 load capacity.

This project also included an upgrade to the road between the two bridges, an upgrade to the stormwater drainage, plus additional safety upgrades including the replacement of guardrails, installation of line markings, and new signage.

Ecological consultants were engaged to ensure all the fauna in the works area were well taken care of during the project, including the endangered species like Warragul Burrowing Crayfish and the Flinders Pygmy Perch which were salvaged during the project.

Project Scope

Project Scope

The full project scope included (but was not limited to):

  • Construction of bridge foundations, including abutments
  • Installation of precast concrete deck beams and cast-in-situ concrete deck overlay
  • Installation of rock beaching and erosion protection works
  • Installation of bridge barriers
  • Earthworks and excavation for pavement construction
  • Construction of road formation
  • Construction of stormwater drainage
  • Installation of approach guardrail and terminals
  • Installation of warning signs and guideposts.

Project Images

Before

Before1.jpg Before2.jpg

Before3.jpg Before4.jpg

In Progress

Progress.jpg Progress1.jpg

Progress2.jpg Progress3.jpg

Progress4.jpg Progress5.jpg

Complete

 Complete1.jpg Complete2.jpg

Complete3.jpg Complete4.jpg


Contact Us

We're here to help! If you have any questions or feedback about the Factory Road Project please contact our team via email or by calling 1300 229 229.

Location

Factory Road, Yarragon 3823  View Map

Google Map